Here you can find an accessible text alternative for a diagram on overheating in historic buildings, showing the percentage of occupied building spaces failing TM52 criteria for Historic England Cambridge, Swindon and York offices, under 2020, 2050 and 2080 weather files.
Cambridge office
- In 2020 the percentage failing was 32%
- In 2050 the projected percentage failing would be 57%
- In 2080 the projected percentage failing would be 79%
Swindon office
- In 2020 the percentage failing is 32%
- By 2050 the projected percentage failing would be 56%
- by 2080 the projected percentage failing would be 75%
York office
- In 2020 the percentage failing is: 9%
- By 2050 the projected percentage failing would be: 42%
- by 2080 the projected percentage failing would be: 79%